ZARAGOZA TRAM

In 2009, CAF was awarded the production and delivery of 21 URBOS trams for the city of Zaragoza. These are 100% low floor and consist of 5 modules each. The units are fitted with an on-board energy storage system (GREENTECH) which permits both catenary free LRV travel between stops, and energy saving via maximum braking energy recovery. The first unit was set into service in April, 2011.

This Zaragoza Tram Project was awarded "Best project in the world" in the "Light Rail Awards 2012".

 

EPD

Other Projects

Technical data sheet

  • CompositionMc-S-T-S-Mc
  • Train length (mm): 32,314
  • Total Passenger Capacity 296 (6p/m2)
  • Maximum speed (km/h) 70
  • Equipment
    • Cab air conditioning
    • Passenger saloon air conditioning
    • Audio and visual information for passengers
    • Events recorder (black box)
    • Control and supervision system
    • On board passenger counting system
    • Video surveillance
    • Greentech
This Website uses cookies processed by us or third-parties to enable the correct functioning of the Website and to carry out statistical analyses of the browsing habits of our visitors in order to improve the content of the Website and optimise the services offered through it. For this purpose, we process personal data, such as your browsing data. You can learn more about the cookies we use on the Website here. If you want all of our cookies to be installed, click on "ACCEPT COOKIES". Likewise, if you only want the cookies necessary for the operation of the website to be installed, click on "REJECT COOKIES". Finally, should you wish to configure your cookie preferences, click on "CONFIGURE COOKIES".