ANTALYA LIGHT METRO

In 2007, CAF signed a contract to supply 14 trams for the first light metro system in the city of Antalya. The line runs for 11.1 km with 16 stations.The trams are 100% low floor, consisting of 5 cars.

The deliveries were made in 2009. These trams are based on the URBOS solution developed by CAF for urban transport.

Other Projects

Technical data sheet

  • CompositionMc-S-T-S-Mc
  • Train length (mm): 35,176
  • Total Passenger Capacity 282 (6p/m2)
  • Maximum speed (km/h) 70
  • Equipment
    • Closxed circuit surveillance
    • Radio-communication System
    • Signalling system
    • Event recorder
    • Train and diagnosis control system
    • Sanders for the motor bogies
This Website uses cookies processed by us or third-parties to enable the correct functioning of the Website and to carry out statistical analyses of the browsing habits of our visitors in order to improve the content of the Website and optimise the services offered through it. For this purpose, we process personal data, such as your browsing data. You can learn more about the cookies we use on the Website here. If you want all of our cookies to be installed, click on "ACCEPT COOKIES". Likewise, if you only want the cookies necessary for the operation of the website to be installed, click on "REJECT COOKIES". Finally, should you wish to configure your cookie preferences, click on "CONFIGURE COOKIES".