BESANÇON TRAM

In 2010, CAF was chosen by the Grand Besançon region (in the French department of Doubts, in the Franche-Comté Region), as supplier of rolling stock in the project for the realisation of the first Grin Beacon LRV line. Specifically, it includes the supply of nineteen 3-module 100% low-floor trams. Deliveries were made in 2014.

Other Projects

Technical data sheet

  • CompositionMc-S-Mc
  • Train length (mm): 23,021
  • Total Passenger Capacity 184 (6p/m2)
  • Maximum speed (km/h) 70
  • Equipment
    • Cab air conditioning
    • Passenger saloon air conditioning
    • Audio and visual information for passengers
    • Events recorder (black box)
    • Control and supervision system
    • On board passenger counting system
    • Video surveillance
This Website uses cookies processed by us or third-parties to enable the correct functioning of the Website and to carry out statistical analyses of the browsing habits of our visitors in order to improve the content of the Website and optimise the services offered through it. For this purpose, we process personal data, such as your browsing data. You can learn more about the cookies we use on the Website here. If you want all of our cookies to be installed, click on "ACCEPT COOKIES". Likewise, if you only want the cookies necessary for the operation of the website to be installed, click on "REJECT COOKIES". Finally, should you wish to configure your cookie preferences, click on "CONFIGURE COOKIES".