METRO ISTANBUL

In 2009, CAF signed a contract to supply 30 metro units for the Turkish city of Istanbul. Each unit consists of four cars, (three motor cars and one trailer car). These new trains shall be incorporated on the new Istanbul, Kadiko and – Kartal line, in the Asian side of the city. The deliveries were made in 2012.

Other Projects

Technical data sheet

  • CompositionMc-M-T-Mc
  • Train length (mm): 89.280
  • Total Passenger Capacity 1.309 (8p/m2)
  • Maximum speed (km/h) 80
  • Equipment
    • Event recorder
    • Video surveillance and passenger information system
    • ATC + CBTC safety equipment
    • ATO and ATP signalling system
    • Train and diagnosis control system
    • Air conditioning and heating