METRO ALGIERS

CAF has manufactured 14 metro units that run on the first Alger metro line that joins Haï el Badr and Tafourah Grande Poste. The trains are made up of 6 cars each and passengers can move along the train through unobstructed gangways.

In addition to supplying the rolling stock to Entreprise du Métro d´Alger, CAF has been commissioned with the full fitting out of maintenance workshops, the supply of auxiliary vehicles and the performance of train maintenance.

Other Projects

Technical data sheet

  • CompositionTc-M-M-M-M-Tc
  • Train length (mm): 107,980
  • Total Passenger Capacity 1,290 (6p/m2)
  • Maximum speed (km/h) 72
  • Equipment
    • Event recorder
    • Audio and visual information for passengers
    • Public Address System
    • Line exterior and train number signs.
    • Intercoms associated to alarm handles, one per passenger door.
    • ATP CBTC equipment
    • Gangway
    • Full duplex TETRA train-ground radio equipment
    • Train and diagnostics control system by means of programmed logic
This Website uses cookies processed by us or third-parties to enable the correct functioning of the Website and to carry out statistical analyses of the browsing habits of our visitors in order to improve the content of the Website and optimise the services offered through it. For this purpose, we process personal data, such as your browsing data. You can learn more about the cookies we use on the Website here. If you want all of our cookies to be installed, click on "ACCEPT COOKIES". Likewise, if you only want the cookies necessary for the operation of the website to be installed, click on "REJECT COOKIES". Finally, should you wish to configure your cookie preferences, click on "CONFIGURE COOKIES".