METRO LYON LINE D
- Project: METRO LYON LINE D
- Flota: 36 2-car units.
- Segment: Metro
- Structure Mc-Mc
- Customer SYTRAL, Sindicat Mixte des Transport pour le Rhône et l´Agglomération Lyonnaise
- Scope of refurbishment:
- - Aluminium carbody repairs.
- - Cab paintwork refurbishment.
- - Door refurbishment.
- - Pneumatic pipe cleaning.
- - Flooring laying.
- - LV circuit and auxiliary energy.
MC: motor car with cab M: motor car without cab T: trailer car PT: trailer car with automatic piloting.