Press releases

2003/10/15

Renfe awards CAF a contract for manufacturing and maintaining 40 CIVIA commuter trains

The model to be constructed corresponds to the technology defined in the CIVIA platform designed and developed exclusively by CAF. The train has a modular structure which allows the formation of compositions made up of 2 to 5 coaches. It incorporates the latest technological advances, such as shared bogies and light materials which reduce consumption and increase safety and comfort, as well as computerised control systems with the most advanced European standards (COSMOS control network developed exclusively by CAF). The CIVIA trains are adaptable and versatile, and may be updated with future developments. 31 of the 40 units will be 5-coach compositions and the rest will have 3 coaches. The trains will be delivered between the middle of 2005 and the end of 2007.

Share:
Go to Press Releases

Press contact

For any enquiry, please contact our Press Department:

Press release file

This Website uses cookies processed by us or third-parties to enable the correct functioning of the Website and to carry out statistical analyses of the browsing habits of our visitors in order to improve the content of the Website and optimise the services offered through it. For this purpose, we process personal data, such as your browsing data. You can learn more about the cookies we use on the Website here. If you want all of our cookies to be installed, click on "ACCEPT COOKIES". Likewise, if you only want the cookies necessary for the operation of the website to be installed, click on "REJECT COOKIES". Finally, should you wish to configure your cookie preferences, click on "CONFIGURE COOKIES".