METRO BARCELONA S/6000 LINE 1

In 2005 Transports Metropolitans de Barcelona awarded CAF the supply of 10 metro units. This five car unit consists of two motor cars with cab, two intermediate motor cars and a trailer car. Deliveries were made between 2007 and 2008. The first train was set into service in 2007.

Other Projects

Technical data sheet

  • CompositionMc-M-T-M-Mc
  • Train length (mm): 86,170
  • Total Passenger Capacity 1,117 (6p/m2)
  • Maximum speed (km/h) 90
  • Equipment
    • Saloon air conditioning
    • Retractable cab to change to automatic pilot.
    • CCTV: Video surveillance system<
    • Automatic train control (ATO and ATP)
    • Passenger driver intercom
    • Public Address System
    • Unobstructed gangway between cars
    • Event Recorder (OTMR)
    • Train recorder
    • Passenger information system
    • Broad band W-LAN train-ground data exchange system
    • Vehicle monitoring system
    • Fire detection system
    • Motorized digtital system for equipment control
    • Specific bicycle area
This Website uses cookies processed by us or third-parties to enable the correct functioning of the Website and to carry out statistical analyses of the browsing habits of our visitors in order to improve the content of the Website and optimise the services offered through it. For this purpose, we process personal data, such as your browsing data. You can learn more about the cookies we use on the Website here. If you want all of our cookies to be installed, click on "ACCEPT COOKIES". Likewise, if you only want the cookies necessary for the operation of the website to be installed, click on "REJECT COOKIES". Finally, should you wish to configure your cookie preferences, click on "CONFIGURE COOKIES".