REGIONAL TRAIN S/3000 NIR

In 2002 Northern Ireland Railways awarded CAF the production of 23 diesel units each with 3 cars. Deliveries were made between 2004 and 2005. The first train was set into comercial service in November, 2004.

Other Projects

Technical data sheet

  • CompositionMc-M-Mc
  • Train length (mm): 70,618
  • Total Passenger Capacity 482
  • Maximum speed (km/h) 145
  • Equipment
    • Event recorder
    • Interleaving gangway
    • Train control and monitoring system, selective door opening
    • Video surveillance system
    • Locking prevention system
    • PRM toilet
    • Standard toilet
    • Passenger information system
    • Front destination indication
    • Sides and interior
    • Fire detection and extinguishing system for Diesel motors.
    • Handicapped manual ramp access
This Website uses cookies processed by us or third-parties to enable the correct functioning of the Website and to carry out statistical analyses of the browsing habits of our visitors in order to improve the content of the Website and optimise the services offered through it. For this purpose, we process personal data, such as your browsing data. You can learn more about the cookies we use on the Website here. If you want all of our cookies to be installed, click on "ACCEPT COOKIES". Likewise, if you only want the cookies necessary for the operation of the website to be installed, click on "REJECT COOKIES". Finally, should you wish to configure your cookie preferences, click on "CONFIGURE COOKIES".