VALENCIA TRAM

Between 1993 and 1994 CAF produced and supplied 12 trams to Ferrocarriles de la Generalitat Valenciana. Subsequently, CAF signed another contract with the operator to supply 4 more units that were supplied in 1999. The tram, which is 70% low floor and metric gauge, consists of three articulated carbodies which rest on two motor bogies at the end and a supporting bogie on the central carbody. This is a bidirectional vehicle with one driver’s cab and four access doors on the right hand side of the vehicle.

Other Projects

Technical data sheet

  • CompositionMc-T-M
  • Train length (mm): 23,780
  • Total Passenger Capacity 246 (8p/m2)
  • Maximum speed (km/h) 65
  • Equipment
    • Cab air conditioning
    • Automatic station announcer and graphics of active lines.
    • Black box
    • Automatic couplers
    • Destination information
    • Public Address System
    • Teleindicator panels
    • Gangway between cars
    • PMR Ramps (disapled persons)
    • RadiotelephonY
    • Resilient wheels.
    • ATP/ATO System
This Website uses cookies processed by us or third-parties to enable the correct functioning of the Website and to carry out statistical analyses of the browsing habits of our visitors in order to improve the content of the Website and optimise the services offered through it. For this purpose, we process personal data, such as your browsing data. You can learn more about the cookies we use on the Website here. If you want all of our cookies to be installed, click on "ACCEPT COOKIES". Likewise, if you only want the cookies necessary for the operation of the website to be installed, click on "REJECT COOKIES". Finally, should you wish to configure your cookie preferences, click on "CONFIGURE COOKIES".