Between 1993 and 1994 CAF produced and supplied 12 trams to Ferrocarriles de la Generalitat Valenciana. Subsequently, CAF signed another contract with the operator to supply 4 more units that were supplied in 1999. The tram, which is 70% low floor and metric gauge, consists of three articulated carbodies which rest on two motor bogies at the end and a supporting bogie on the central carbody. This is a bidirectional vehicle with one driver’s cab and four access doors on the right hand side of the vehicle.