TEL AVIV TRAM

NTA (Metropolitan Mass Transit Systems) has opted for the transport consortium made up of the CAF Group and the construction firm Shapir for the Tel Aviv LRV Purple Line. 

As well as the construction of both the line and a depot, this project includes the design and supply of 98 new unidirectional Urbos low-floor trams– almost 35 metres long– with doors on both sides, which will comprise of 5 modules. It will operate 100% coupled in a double consist.

The scope of the project for the consortium also includes the supply of the signalling, simulator, energy and communication systems, as well as maintenance of the line for a term of 25 years. 

Other Projects

Technical data sheet

  • CompositionMc-S-T-S-Mc / Mc-S-T-S-Mc
  • Train length (mm): 34,644 + 34,644
  • Total Passenger Capacity 472 (acoplado)
  • Maximum speed (km/h) 80
  • Equipment
    • HVAC
    • Passenger information system 
    • Video surveillance system 
    • CBTC Train Automatic Protection equipment
    • Fire Detection System
    • Control and diagnostics by programmed logic
    • TCMS System
    • Obstacle detection
    • Automatic coupling
    • Gangways
    • Event Recorder
    • Passenger counter
    • Cab access control
    • Passenger Wi-Fi
This Website uses cookies processed by us or third-parties to enable the correct functioning of the Website and to carry out statistical analyses of the browsing habits of our visitors in order to improve the content of the Website and optimise the services offered through it. For this purpose, we process personal data, such as your browsing data. You can learn more about the cookies we use on the Website here. If you want all of our cookies to be installed, click on "ACCEPT COOKIES". Likewise, if you only want the cookies necessary for the operation of the website to be installed, click on "REJECT COOKIES". Finally, should you wish to configure your cookie preferences, click on "CONFIGURE COOKIES".